Skip to content

Complete Knocked-Down Cooperation

CKD Vehicle Assembly Cooperation

Review a complete knocked-down project direction around the vehicle, local capability and confirmed responsibilities.

Vehicle body production line at the manufacturing facility

What It Means

What CKD means for your project

CKD means Complete Knocked-Down. Exact parts scope, assembly direction, local capability needs, documentation and responsibilities are confirmed for each vehicle and project.

Project note

Final vehicle, technical, commercial, documentation and responsibility details are confirmed during the actual project review.

Suitable project direction

Use these points to judge whether this cooperation direction is a sensible starting point.

Defined assembly project

For partners with a structured local assembly direction and a vehicle-specific project to review.

Detailed technical confirmation

Parts, processes, responsibilities and support direction require project-level technical review.

Longer coordination chain

Vehicle, supply, assembly, documentation and local capability questions are aligned before confirmation.

Project Inputs

Information to prepare

Clear project inputs help the factory team review the vehicle and cooperation direction.

01

Target market and assembly project background

02

Preferred vehicle model or application

03

Expected project quantity

04

Local facility, equipment and technical direction

05

Required supply, documentation and support scope

What TOURWAY Coordinates

Connect the vehicle, factory and project scope

The factory team aligns the confirmed vehicle and project across the required coordination points.

  • Vehicle availability and project review
  • Complete knocked-down scope discussion
  • Parts, process and responsibility confirmation
  • Manufacturing and supply coordination
  • Documentation and delivery direction
Real final assembly environment supporting vehicle project coordination
Jiangsu New Wanbao commercial vehicle factory building in Danyang, Jiangsu, China

Factory Support

Coordinated by the manufacturer behind TOURWAY

Jiangsu New Wanbao Vehicle Industry Manufacturing Co., Ltd. reviews the vehicle, manufacturing and cooperation direction from Danyang, Jiangsu, China.

Project Workflow

Typical project flow

The sequence remains consistent while the technical scope changes by vehicle and project.

01

Requirement Review

Confirmed in sequence according to the actual vehicle and project.

02

Vehicle Direction

Confirmed in sequence according to the actual vehicle and project.

03

Capability Review

Confirmed in sequence according to the actual vehicle and project.

04

Technical Confirmation

Confirmed in sequence according to the actual vehicle and project.

05

Factory Coordination

Confirmed in sequence according to the actual vehicle and project.

06

Delivery Coordination

Confirmed in sequence according to the actual vehicle and project.

Related TOURWAY vehicle platforms

T5, T6, T7 and T8 can be reviewed as starting points. Final availability is confirmed per project.

TOURWAY T5

Vehicle availability and the workable cooperation scope are reviewed for the actual market and project.

TOURWAY T6

Vehicle availability and the workable cooperation scope are reviewed for the actual market and project.

TOURWAY T7

Vehicle availability and the workable cooperation scope are reviewed for the actual market and project.

TOURWAY T8

Vehicle availability and the workable cooperation scope are reviewed for the actual market and project.

Cooperation Comparison

Compare CBU, DKD, SKD and CKD

Compare delivery direction, local assembly involvement and factory coordination without unverified price or savings claims.

CBU

Delivery Direction: Complete vehicle direction

Local Assembly Involvement: No local vehicle assembly direction

Assembly Direction: Finished vehicle supply

Project Confirmation Requirement: Project confirmation required

Vehicle Availability Review: Vehicle availability reviewed

Factory Coordination: Factory coordinates vehicle, inspection, documents and delivery

DKD

Delivery Direction: Project-specific knock-down direction

Local Assembly Involvement: Local involvement confirmed by project

Assembly Direction: Scope confirmed by vehicle and project

Project Confirmation Requirement: Project confirmation required

Vehicle Availability Review: Vehicle availability reviewed

Factory Coordination: Factory coordinates scope, supply, documents and delivery

SKD

Delivery Direction: Semi knocked-down direction

Local Assembly Involvement: Defined local assembly involvement

Assembly Direction: Assembly direction is project-specific

Project Confirmation Requirement: Project confirmation required

Vehicle Availability Review: Vehicle availability reviewed

Factory Coordination: Factory coordinates vehicle, scope, supply and documents

CKD

Delivery Direction: Complete knocked-down direction

Local Assembly Involvement: Structured local assembly involvement

Assembly Direction: Parts and assembly direction confirmed per project

Project Confirmation Requirement: Detailed project confirmation required

Vehicle Availability Review: Vehicle availability reviewed

Factory Coordination: Factory coordinates vehicle, parts scope, documents and supply

CKD Vehicle Assembly Cooperation FAQ

Is the CKD parts scope identical for every project?

No. The exact parts and supply scope are confirmed for the selected vehicle and project.

What local capability information is required?

Share the facility, equipment, technical direction, target vehicle, quantity and expected responsibility split.

Does TOURWAY publish savings claims for CKD?

No. Cost, tariff and commercial outcomes depend on the actual market and project and are not claimed on this page.

How is the project started?

Begin with a requirement review, then confirm the vehicle, local capability, technical scope and coordination direction.

General cooperation questions

How is the final cooperation direction selected?

The direction is reviewed against the target market, selected vehicle, local project, assembly involvement and required factory support.

Can the same scope be used for every vehicle?

No. Vehicle availability and the workable supply or assembly scope are confirmed model by model and project by project.

What should be included in an RFQ?

Share the market, vehicle or application direction, expected quantity, cooperation preference and relevant local project information.

Are price, tariff, savings or lead-time claims published here?

No. Commercial and regulatory outcomes are confirmed for the actual destination market and project.

Request a quote for your vehicle project

Share the intended market and operating requirement. TOURWAY will use the confirmed inputs to prepare the next discussion.

Useful RFQ inputs

  • Target market and application
  • Preferred TOURWAY model or platform direction
  • Expected quantity and project timing
  • Passenger, cargo, interior, equipment or cooperation needs

The existing contact form and recipient settings remain unchanged.