Complete Knocked-Down Cooperation
CKD Vehicle Assembly Cooperation
Review a complete knocked-down project direction around the vehicle, local capability and confirmed responsibilities.

What It Means
What CKD means for your project
CKD means Complete Knocked-Down. Exact parts scope, assembly direction, local capability needs, documentation and responsibilities are confirmed for each vehicle and project.
Project note
Final vehicle, technical, commercial, documentation and responsibility details are confirmed during the actual project review.
Suitable project direction
Use these points to judge whether this cooperation direction is a sensible starting point.
Defined assembly project
For partners with a structured local assembly direction and a vehicle-specific project to review.
Detailed technical confirmation
Parts, processes, responsibilities and support direction require project-level technical review.
Longer coordination chain
Vehicle, supply, assembly, documentation and local capability questions are aligned before confirmation.
Project Inputs
Information to prepare
Clear project inputs help the factory team review the vehicle and cooperation direction.
01
Target market and assembly project background
02
Preferred vehicle model or application
03
Expected project quantity
04
Local facility, equipment and technical direction
05
Required supply, documentation and support scope
What TOURWAY Coordinates
Connect the vehicle, factory and project scope
The factory team aligns the confirmed vehicle and project across the required coordination points.
- Vehicle availability and project review
- Complete knocked-down scope discussion
- Parts, process and responsibility confirmation
- Manufacturing and supply coordination
- Documentation and delivery direction


Factory Support
Coordinated by the manufacturer behind TOURWAY
Jiangsu New Wanbao Vehicle Industry Manufacturing Co., Ltd. reviews the vehicle, manufacturing and cooperation direction from Danyang, Jiangsu, China.
Project Workflow
Typical project flow
The sequence remains consistent while the technical scope changes by vehicle and project.
01
Requirement Review
Confirmed in sequence according to the actual vehicle and project.
02
Vehicle Direction
Confirmed in sequence according to the actual vehicle and project.
03
Capability Review
Confirmed in sequence according to the actual vehicle and project.
04
Technical Confirmation
Confirmed in sequence according to the actual vehicle and project.
05
Factory Coordination
Confirmed in sequence according to the actual vehicle and project.
06
Delivery Coordination
Confirmed in sequence according to the actual vehicle and project.
Related TOURWAY vehicle platforms
T5, T6, T7 and T8 can be reviewed as starting points. Final availability is confirmed per project.
TOURWAY T5
Vehicle availability and the workable cooperation scope are reviewed for the actual market and project.
TOURWAY T6
Vehicle availability and the workable cooperation scope are reviewed for the actual market and project.
TOURWAY T7
Vehicle availability and the workable cooperation scope are reviewed for the actual market and project.
TOURWAY T8
Vehicle availability and the workable cooperation scope are reviewed for the actual market and project.
Cooperation Comparison
Compare CBU, DKD, SKD and CKD
Compare delivery direction, local assembly involvement and factory coordination without unverified price or savings claims.
CBU
Delivery Direction: Complete vehicle direction
Local Assembly Involvement: No local vehicle assembly direction
Assembly Direction: Finished vehicle supply
Project Confirmation Requirement: Project confirmation required
Vehicle Availability Review: Vehicle availability reviewed
Factory Coordination: Factory coordinates vehicle, inspection, documents and delivery
DKD
Delivery Direction: Project-specific knock-down direction
Local Assembly Involvement: Local involvement confirmed by project
Assembly Direction: Scope confirmed by vehicle and project
Project Confirmation Requirement: Project confirmation required
Vehicle Availability Review: Vehicle availability reviewed
Factory Coordination: Factory coordinates scope, supply, documents and delivery
SKD
Delivery Direction: Semi knocked-down direction
Local Assembly Involvement: Defined local assembly involvement
Assembly Direction: Assembly direction is project-specific
Project Confirmation Requirement: Project confirmation required
Vehicle Availability Review: Vehicle availability reviewed
Factory Coordination: Factory coordinates vehicle, scope, supply and documents
CKD
Delivery Direction: Complete knocked-down direction
Local Assembly Involvement: Structured local assembly involvement
Assembly Direction: Parts and assembly direction confirmed per project
Project Confirmation Requirement: Detailed project confirmation required
Vehicle Availability Review: Vehicle availability reviewed
Factory Coordination: Factory coordinates vehicle, parts scope, documents and supply
CKD Vehicle Assembly Cooperation FAQ
Is the CKD parts scope identical for every project?
No. The exact parts and supply scope are confirmed for the selected vehicle and project.
What local capability information is required?
Share the facility, equipment, technical direction, target vehicle, quantity and expected responsibility split.
Does TOURWAY publish savings claims for CKD?
No. Cost, tariff and commercial outcomes depend on the actual market and project and are not claimed on this page.
How is the project started?
Begin with a requirement review, then confirm the vehicle, local capability, technical scope and coordination direction.
General cooperation questions
How is the final cooperation direction selected?
The direction is reviewed against the target market, selected vehicle, local project, assembly involvement and required factory support.
Can the same scope be used for every vehicle?
No. Vehicle availability and the workable supply or assembly scope are confirmed model by model and project by project.
What should be included in an RFQ?
Share the market, vehicle or application direction, expected quantity, cooperation preference and relevant local project information.
Are price, tariff, savings or lead-time claims published here?
No. Commercial and regulatory outcomes are confirmed for the actual destination market and project.
Request a quote for your vehicle project
Share the intended market and operating requirement. TOURWAY will use the confirmed inputs to prepare the next discussion.
Useful RFQ inputs
- Target market and application
- Preferred TOURWAY model or platform direction
- Expected quantity and project timing
- Passenger, cargo, interior, equipment or cooperation needs
The existing contact form and recipient settings remain unchanged.
